Abrir la demo
Casos practicos / Calidad y seguridad
Calidad y seguridad

Run site quality checks with digital forms

Build the quality checklist from the specification, complete it on site with photos and sign-off, flag the fails to the quality system and keep every completed check as part of the record.

4 pasos9 minContratista generalSubcontratista especializadoGerente de proyecto / construcción

Cómo funciona, paso a paso

4 pasos a lo largo de la plataforma - qué haces en cada uno y por qué importa.

1

Build the checklist

Formatos y listas de verificación

Build the check as a digital form straight from the specification and the inspection and test plan, so it asks exactly the acceptance criteria the work has to meet.

Por que: A checklist that mirrors the specification is a checklist that catches real defects. One made up from memory misses the clause that matters and passes work that should have failed.

EntradaSpecification and ITPResultadoDigital checklist
2

Complete it on site

Inspecciones

Complete the check at the workface with photos and the inspector sign-off, capturing the result where the work is rather than back in the office from memory.

Por que: A check completed at the point of work, with a photo and a time on it, is evidence. One filled in later is a guess dressed up as a record, and it falls apart under scrutiny.

EntradaDigital checklistCompleted workResultadoCompleted check
3

Flag the fails

Gestión de calidad

Route the failed items into the quality system as actions to put right, with the photo and the failed criterion attached, so nothing that failed a check is quietly built over.

Por que: A failed check with no follow-up is worse than no check, because it records that you knew. Turning fails into tracked actions is what closes the loop between finding a defect and fixing it.

EntradaCompleted checkResultadoFails routed for fix
4

Keep the record

Gestión de calidad

Keep the completed checks together as the running quality record, so the evidence for each element is filed and ready long before the handover pack is due.

Por que: Quality records assembled as you go are complete and cheap. The same records reconstructed at handover are full of holes and cost weeks of chasing signatures for work long since covered.

EntradaCompleted checksResultadoQuality record

Más en Calidad y seguridad