Run site quality checks with digital forms

Build the quality checklist from the specification, complete it on site with photos and sign-off, flag the fails to the quality system and keep every completed check as part of the record.

4 langkah9 mntKontraktor umumSubkontraktor spesialisManajer proyek / konstruksi

Cara kerjanya, langkah demi langkah

4 langkah di seluruh platform - apa yang Anda lakukan di setiap langkah dan mengapa itu penting.

1

Build the checklist

Formulir & daftar periksa

Build the check as a digital form straight from the specification and the inspection and test plan, so it asks exactly the acceptance criteria the work has to meet.

Mengapa: A checklist that mirrors the specification is a checklist that catches real defects. One made up from memory misses the clause that matters and passes work that should have failed.

MasukanSpecification and ITPHasilDigital checklist
2

Complete it on site

Inspeksi

Complete the check at the workface with photos and the inspector sign-off, capturing the result where the work is rather than back in the office from memory.

Mengapa: A check completed at the point of work, with a photo and a time on it, is evidence. One filled in later is a guess dressed up as a record, and it falls apart under scrutiny.

MasukanDigital checklistCompleted workHasilCompleted check
3

Flag the fails

Manajemen Kualitas

Route the failed items into the quality system as actions to put right, with the photo and the failed criterion attached, so nothing that failed a check is quietly built over.

Mengapa: A failed check with no follow-up is worse than no check, because it records that you knew. Turning fails into tracked actions is what closes the loop between finding a defect and fixing it.

MasukanCompleted checkHasilFails routed for fix
4

Keep the record

Manajemen Kualitas

Keep the completed checks together as the running quality record, so the evidence for each element is filed and ready long before the handover pack is due.

Mengapa: Quality records assembled as you go are complete and cheap. The same records reconstructed at handover are full of holes and cost weeks of chasing signatures for work long since covered.

MasukanCompleted checksHasilQuality record