Answer a GAEB inquiry as a subcontractor

Take the contractor's GAEB inquiry into your own LV, price your trade with your own rates, decide between Hauptangebot and Nebenangebot, and send the X84 back before the deadline.

7 שלבים11 דק׳קבלן משנה מתמחה

איך זה עובד, שלב אחר שלב

7 שלבים לאורך הפלטפורמה - מה עושים בכל שלב ולמה זה חשוב.

1

Log the inquiry and its deadline

ניהול הצעות

Log the inquiry the general contractor sent you: which trade package it covers, the Abgabefrist and the Bindefrist you are held to, and whether the letter admits Nebenangebote at all.

למה: Whether an alternate is allowed is decided by the inquiry, not by you. Reading that together with the deadline on day one is what stops a good idea being set aside on a formality, or a finished price arriving an hour late.

נכנסInquiry from the contractorGAEB X83 fileיוצאLogged inquiryAbgabefrist on recordNebenangebot rule
2

Import the X83 into your own LV

חילופי GAEB

Drop the X83 on the import tab, check the parsed positions in the preview and take them into a fresh LV in your own project. Ordinal numbers, quantities, units and Langtext arrive exactly as the contractor issued them.

למה: Retyping the contractor's LV is where a transposed quantity or a dropped position becomes a loss you carry to site. Importing keeps your price tied to their numbering, so every line answers the line they asked about.

נכנסGAEB X83 fileYour projectיוצאLV with positionsOriginal OZ numbering
3

Cut the bill down to your trade

כתב כמויות

Work through the imported LV and keep the titles and positions that belong to your trade, whether that is Trockenbau or TGA, and mark what is outside your scope. Check the quantities against your own take before you price a line.

למה: A Nachunternehmer prices one trade out of a bill written for the whole building. Drawing that boundary first keeps your offer comparable, and checking the quantity is what stops you carrying the planner's undermeasure at your own risk.

נכנסImported LVYour trade scopeיוצאYour trade packageExclusions noted
4

Price it with your own rates

קטלוג משאבים

Price every position from your own rates and assemblies instead of somebody else's guide price: labour, material, plant and the surcharge you actually carry, each line read against its Langtext as you go.

למה: Your own rate is the only number you can defend when the contractor asks how you got there. Reading the Langtext while you price is where you find the scaffold, the working hours or the tolerance that would otherwise be free work.

נכנסUnpriced positionsYour own ratesיוצאPriced HauptangebotQualifications noted
5

Separate Hauptangebot from Nebenangebot

כתב כמויות

Keep the priced LV as your Hauptangebot, line for line as asked. Where your method really is better, copy the bill into a second LV, change only the positions your solution touches and write the reason next to each one.

למה: A Nebenangebot wins work when it is a clean second offer the contractor can compare position by position. Mixing the better idea into the main bill instead risks the whole offer being set aside as not answering the tender.

נכנסPriced HauptangebotYour better methodיוצאHauptangebot LVNebenangebot LVReason per changed position
6

Validate both bills before they go out

אימות

Run both LVs through validation: no position left at zero, no quantity that no longer ties back to the X83, and the structure the return file has to honour still intact.

למה: A single unpriced position can void the whole submission, and nobody reads several hundred lines twice at four in the afternoon on the deadline day. Validation is the second pair of eyes that takes a minute.

נכנסHauptangebot LVNebenangebot LVיוצאValidation reportGaps closed
7

Export the X84 and submit on time

חילופי GAEB

Export each priced LV on the export tab as its own X84, name the files so the contractor sees at a glance which one is the Hauptangebot and which the Nebenangebot, and send them with your covering letter before the Abgabefrist.

למה: An X84 reads straight into the contractor's bid comparison, so your prices land in the evaluation without anybody rekeying them. Two clearly named files are what let your alternate be judged rather than put aside.

נכנסValidated billsAbgabefristיוצאX84 HauptangebotX84 NebenangebotSubmission on record
מודולים

המודולים בתרחיש הזה

5 מתוך 184 מודולי הפלטפורמה

עוד ב-מכרזים ורכש

מכרזים ורכש

הוצאת מכרז מכתב כמויות

הוציאו כתב כמויות מתומחר לשוק: אריזה, הזמנת קבלני המשנה, השוואת ההצעות והענקת המכרז. חמישה ש…

5 שלבים12 דק׳פתיחה
מכרזים ורכש

רכישת חומרים מכתב הכמויות

רכשו את הכמויות שכבר תמחרתם: העלו דרישת רכש מהכתב, הוציאו את ההזמנה לספק ורשמו את הסחורה באת…

4 שלבים10 דק׳פתיחה
מכרזים ורכש

השוואת הצעות והחלטת זכייה

קחו תיקייה של הצעות מחיר שחזרו ואף פעם לא ממש מתאימות, פרקו אותן חזרה לאותו היקף, ומסרו ללקו…

3 שלבים12 דק׳פתיחה