Casos prácticos / Licitación y compras
Licitación y compras

Answer a GAEB inquiry as a subcontractor

Take the contractor's GAEB inquiry into your own LV, price your trade with your own rates, decide between Hauptangebot and Nebenangebot, and send the X84 back before the deadline.

7 pasos11 minSubcontratista especializado

Cómo funciona, paso a paso

7 pasos a lo largo de la plataforma - qué haces en cada uno y por qué importa.

1

Log the inquiry and its deadline

Gestión de ofertas

Log the inquiry the general contractor sent you: which trade package it covers, the Abgabefrist and the Bindefrist you are held to, and whether the letter admits Nebenangebote at all.

Captura de pantalla, paso 1: Log the inquiry and its deadline (Gestión de ofertas, Answer a GAEB inquiry as a subcontractor)
Gestión de ofertas: Log the inquiry and its deadline

Por que: Whether an alternate is allowed is decided by the inquiry, not by you. Reading that together with the deadline on day one is what stops a good idea being set aside on a formality, or a finished price arriving an hour late.

EntradaInquiry from the contractorGAEB X83 fileResultadoLogged inquiryAbgabefrist on recordNebenangebot rule
2

Import the X83 into your own LV

Intercambio GAEB

Drop the X83 on the import tab, check the parsed positions in the preview and take them into a fresh LV in your own project. Ordinal numbers, quantities, units and Langtext arrive exactly as the contractor issued them.

Por que: Retyping the contractor's LV is where a transposed quantity or a dropped position becomes a loss you carry to site. Importing keeps your price tied to their numbering, so every line answers the line they asked about.

EntradaGAEB X83 fileYour projectResultadoLV with positionsOriginal OZ numbering
3

Cut the bill down to your trade

Presupuesto

Work through the imported LV and keep the titles and positions that belong to your trade, whether that is Trockenbau or TGA, and mark what is outside your scope. Check the quantities against your own take before you price a line.

Captura de pantalla, paso 3: Cut the bill down to your trade (Presupuesto, Answer a GAEB inquiry as a subcontractor)
Presupuesto: Cut the bill down to your trade

Por que: A Nachunternehmer prices one trade out of a bill written for the whole building. Drawing that boundary first keeps your offer comparable, and checking the quantity is what stops you carrying the planner's undermeasure at your own risk.

EntradaImported LVYour trade scopeResultadoYour trade packageExclusions noted
4

Price it with your own rates

Catálogo de recursos

Price every position from your own rates and assemblies instead of somebody else's guide price: labour, material, plant and the surcharge you actually carry, each line read against its Langtext as you go.

Captura de pantalla, paso 4: Price it with your own rates (Catálogo de recursos, Answer a GAEB inquiry as a subcontractor)
Catálogo de recursos: Price it with your own rates

Por que: Your own rate is the only number you can defend when the contractor asks how you got there. Reading the Langtext while you price is where you find the scaffold, the working hours or the tolerance that would otherwise be free work.

EntradaUnpriced positionsYour own ratesResultadoPriced HauptangebotQualifications noted
5

Separate Hauptangebot from Nebenangebot

Presupuesto

Keep the priced LV as your Hauptangebot, line for line as asked. Where your method really is better, copy the bill into a second LV, change only the positions your solution touches and write the reason next to each one.

Captura de pantalla, paso 5: Separate Hauptangebot from Nebenangebot (Presupuesto, Answer a GAEB inquiry as a subcontractor)
Presupuesto: Separate Hauptangebot from Nebenangebot

Por que: A Nebenangebot wins work when it is a clean second offer the contractor can compare position by position. Mixing the better idea into the main bill instead risks the whole offer being set aside as not answering the tender.

EntradaPriced HauptangebotYour better methodResultadoHauptangebot LVNebenangebot LVReason per changed position
6

Validate both bills before they go out

Validación

Run both LVs through validation: no position left at zero, no quantity that no longer ties back to the X83, and the structure the return file has to honour still intact.

Captura de pantalla, paso 6: Validate both bills before they go out (Validación, Answer a GAEB inquiry as a subcontractor)
Validación: Validate both bills before they go out

Por que: A single unpriced position can void the whole submission, and nobody reads several hundred lines twice at four in the afternoon on the deadline day. Validation is the second pair of eyes that takes a minute.

EntradaHauptangebot LVNebenangebot LVResultadoValidation reportGaps closed
7

Export the X84 and submit on time

Intercambio GAEB

Export each priced LV on the export tab as its own X84, name the files so the contractor sees at a glance which one is the Hauptangebot and which the Nebenangebot, and send them with your covering letter before the Abgabefrist.

Por que: An X84 reads straight into the contractor's bid comparison, so your prices land in the evaluation without anybody rekeying them. Two clearly named files are what let your alternate be judged rather than put aside.

EntradaValidated billsAbgabefristResultadoX84 HauptangebotX84 NebenangebotSubmission on record
Módulos

Módulos de este playbook

5 / 190 módulos de la plataforma

The market this case is written for

Alemania

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Más en Licitación y compras

Licitación y compras

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 pasos12 minAbrir
Licitación y compras

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 pasos10 minAbrir
Licitación y compras

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 pasos12 minAbrir