Een GAEB-aanvraag beantwoorden als onderaannemer

Neem de GAEB-aanvraag van de hoofdaannemer over in uw eigen bestek, beprijs uw vak met uw eigen tarieven, kies tussen Hauptangebot en Nebenangebot, en stuur het X84 terug voor de deadline.

7 stappen11 minGespecialiseerde onderaannemer

Zo werkt het, stap voor stap

7 stappen door het platform - wat je bij elke stap doet en waarom het ertoe doet.

1

Log the inquiry and its deadline

Offertebeheer

Log the inquiry the general contractor sent you: which trade package it covers, the Abgabefrist and the Bindefrist you are held to, and whether the letter admits Nebenangebote at all.

Waarom: Whether an alternate is allowed is decided by the inquiry, not by you. Reading that together with the deadline on day one is what stops a good idea being set aside on a formality, or a finished price arriving an hour late.

InvoerInquiry from the contractorGAEB X83 fileResultaatLogged inquiryAbgabefrist on recordNebenangebot rule
2

Import the X83 into your own LV

GAEB Uitwisseling

Drop the X83 on the import tab, check the parsed positions in the preview and take them into a fresh LV in your own project. Ordinal numbers, quantities, units and Langtext arrive exactly as the contractor issued them.

Waarom: Retyping the contractor's LV is where a transposed quantity or a dropped position becomes a loss you carry to site. Importing keeps your price tied to their numbering, so every line answers the line they asked about.

InvoerGAEB X83 fileYour projectResultaatLV with positionsOriginal OZ numbering
3

Cut the bill down to your trade

Raming

Work through the imported LV and keep the titles and positions that belong to your trade, whether that is Trockenbau or TGA, and mark what is outside your scope. Check the quantities against your own take before you price a line.

Waarom: A Nachunternehmer prices one trade out of a bill written for the whole building. Drawing that boundary first keeps your offer comparable, and checking the quantity is what stops you carrying the planner's undermeasure at your own risk.

InvoerImported LVYour trade scopeResultaatYour trade packageExclusions noted
4

Price it with your own rates

Middelencatalogus

Price every position from your own rates and assemblies instead of somebody else's guide price: labour, material, plant and the surcharge you actually carry, each line read against its Langtext as you go.

Waarom: Your own rate is the only number you can defend when the contractor asks how you got there. Reading the Langtext while you price is where you find the scaffold, the working hours or the tolerance that would otherwise be free work.

InvoerUnpriced positionsYour own ratesResultaatPriced HauptangebotQualifications noted
5

Separate Hauptangebot from Nebenangebot

Raming

Keep the priced LV as your Hauptangebot, line for line as asked. Where your method really is better, copy the bill into a second LV, change only the positions your solution touches and write the reason next to each one.

Waarom: A Nebenangebot wins work when it is a clean second offer the contractor can compare position by position. Mixing the better idea into the main bill instead risks the whole offer being set aside as not answering the tender.

InvoerPriced HauptangebotYour better methodResultaatHauptangebot LVNebenangebot LVReason per changed position
6

Validate both bills before they go out

Validatie

Run both LVs through validation: no position left at zero, no quantity that no longer ties back to the X83, and the structure the return file has to honour still intact.

Waarom: A single unpriced position can void the whole submission, and nobody reads several hundred lines twice at four in the afternoon on the deadline day. Validation is the second pair of eyes that takes a minute.

InvoerHauptangebot LVNebenangebot LVResultaatValidation reportGaps closed
7

Export the X84 and submit on time

GAEB Uitwisseling

Export each priced LV on the export tab as its own X84, name the files so the contractor sees at a glance which one is the Hauptangebot and which the Nebenangebot, and send them with your covering letter before the Abgabefrist.

Waarom: An X84 reads straight into the contractor's bid comparison, so your prices land in the evaluation without anybody rekeying them. Two clearly named files are what let your alternate be judged rather than put aside.

InvoerValidated billsAbgabefristResultaatX84 HauptangebotX84 NebenangebotSubmission on record
Modules

Modules in dit playbook

5 / 190 platformmodules

The market this case is written for

Duitsland

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Meer in Aanbesteding & inkoop

Aanbesteding & inkoop

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 stappen12 minOpenen
Aanbesteding & inkoop

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 stappen10 minOpenen
Aanbesteding & inkoop

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 stappen12 minOpenen