Fall / Upphandling och inköp
Upphandling och inköp

Besvara en GAEB-förfrågan som underentreprenör

Ta huvudentreprenörens GAEB-förfrågan in i din egen LV, prissätt ditt yrke med dina egna á-priser, välj mellan Hauptangebot och Nebenangebot, och skicka tillbaka X84 innan tidsfristen går ut.

7 steg11 minSpecialunderentreprenör

Så fungerar det, steg för steg

7 steg genom plattformen - vad du gör i varje och varför det spelar roll.

1

Log the inquiry and its deadline

Anbudshantering

Log the inquiry the general contractor sent you: which trade package it covers, the Abgabefrist and the Bindefrist you are held to, and whether the letter admits Nebenangebote at all.

Skärmbild, steg 1: Log the inquiry and its deadline (Anbudshantering, Besvara en GAEB-förfrågan som underentreprenör)
Anbudshantering: Log the inquiry and its deadline

Varför: Whether an alternate is allowed is decided by the inquiry, not by you. Reading that together with the deadline on day one is what stops a good idea being set aside on a formality, or a finished price arriving an hour late.

IndataInquiry from the contractorGAEB X83 fileResultatLogged inquiryAbgabefrist on recordNebenangebot rule
2

Import the X83 into your own LV

GAEB-utbyte

Drop the X83 on the import tab, check the parsed positions in the preview and take them into a fresh LV in your own project. Ordinal numbers, quantities, units and Langtext arrive exactly as the contractor issued them.

Varför: Retyping the contractor's LV is where a transposed quantity or a dropped position becomes a loss you carry to site. Importing keeps your price tied to their numbering, so every line answers the line they asked about.

IndataGAEB X83 fileYour projectResultatLV with positionsOriginal OZ numbering
3

Cut the bill down to your trade

Mängdförteckning

Work through the imported LV and keep the titles and positions that belong to your trade, whether that is Trockenbau or TGA, and mark what is outside your scope. Check the quantities against your own take before you price a line.

Skärmbild, steg 3: Cut the bill down to your trade (Mängdförteckning, Besvara en GAEB-förfrågan som underentreprenör)
Mängdförteckning: Cut the bill down to your trade

Varför: A Nachunternehmer prices one trade out of a bill written for the whole building. Drawing that boundary first keeps your offer comparable, and checking the quantity is what stops you carrying the planner's undermeasure at your own risk.

IndataImported LVYour trade scopeResultatYour trade packageExclusions noted
4

Price it with your own rates

Resurskatalog

Price every position from your own rates and assemblies instead of somebody else's guide price: labour, material, plant and the surcharge you actually carry, each line read against its Langtext as you go.

Skärmbild, steg 4: Price it with your own rates (Resurskatalog, Besvara en GAEB-förfrågan som underentreprenör)
Resurskatalog: Price it with your own rates

Varför: Your own rate is the only number you can defend when the contractor asks how you got there. Reading the Langtext while you price is where you find the scaffold, the working hours or the tolerance that would otherwise be free work.

IndataUnpriced positionsYour own ratesResultatPriced HauptangebotQualifications noted
5

Separate Hauptangebot from Nebenangebot

Mängdförteckning

Keep the priced LV as your Hauptangebot, line for line as asked. Where your method really is better, copy the bill into a second LV, change only the positions your solution touches and write the reason next to each one.

Skärmbild, steg 5: Separate Hauptangebot from Nebenangebot (Mängdförteckning, Besvara en GAEB-förfrågan som underentreprenör)
Mängdförteckning: Separate Hauptangebot from Nebenangebot

Varför: A Nebenangebot wins work when it is a clean second offer the contractor can compare position by position. Mixing the better idea into the main bill instead risks the whole offer being set aside as not answering the tender.

IndataPriced HauptangebotYour better methodResultatHauptangebot LVNebenangebot LVReason per changed position
6

Validate both bills before they go out

Validering

Run both LVs through validation: no position left at zero, no quantity that no longer ties back to the X83, and the structure the return file has to honour still intact.

Skärmbild, steg 6: Validate both bills before they go out (Validering, Besvara en GAEB-förfrågan som underentreprenör)
Validering: Validate both bills before they go out

Varför: A single unpriced position can void the whole submission, and nobody reads several hundred lines twice at four in the afternoon on the deadline day. Validation is the second pair of eyes that takes a minute.

IndataHauptangebot LVNebenangebot LVResultatValidation reportGaps closed
7

Export the X84 and submit on time

GAEB-utbyte

Export each priced LV on the export tab as its own X84, name the files so the contractor sees at a glance which one is the Hauptangebot and which the Nebenangebot, and send them with your covering letter before the Abgabefrist.

Varför: An X84 reads straight into the contractor's bid comparison, so your prices land in the evaluation without anybody rekeying them. Two clearly named files are what let your alternate be judged rather than put aside.

IndataValidated billsAbgabefristResultatX84 HauptangebotX84 NebenangebotSubmission on record
Moduler

Moduler i denna playbook

5 / 190 plattformsmoduler

The market this case is written for

Tyskland

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Mer inom Upphandling och inköp

Upphandling och inköp

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 steg12 minÖppna
Upphandling och inköp

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 steg10 minÖppna
Upphandling och inköp

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 steg12 minÖppna