Answer a GAEB inquiry as a subcontractor

Take the contractor's GAEB inquiry into your own LV, price your trade with your own rates, decide between Hauptangebot and Nebenangebot, and send the X84 back before the deadline.

7 مراحل11 منٹخصوصی سب کنٹریکٹر

یہ کیسے کام کرتا ہے، قدم بہ قدم

7 قدم پوری پلیٹ فارم میں - ہر قدم پر کیا کرنا ہے اور یہ کیوں اہم ہے۔

1

Log the inquiry and its deadline

بولی انتظام

Log the inquiry the general contractor sent you: which trade package it covers, the Abgabefrist and the Bindefrist you are held to, and whether the letter admits Nebenangebote at all.

کیوں: Whether an alternate is allowed is decided by the inquiry, not by you. Reading that together with the deadline on day one is what stops a good idea being set aside on a formality, or a finished price arriving an hour late.

اندر جاتا ہےInquiry from the contractorGAEB X83 fileباہر آتا ہےLogged inquiryAbgabefrist on recordNebenangebot rule
2

Import the X83 into your own LV

GAEB تبادلہ

Drop the X83 on the import tab, check the parsed positions in the preview and take them into a fresh LV in your own project. Ordinal numbers, quantities, units and Langtext arrive exactly as the contractor issued them.

کیوں: Retyping the contractor's LV is where a transposed quantity or a dropped position becomes a loss you carry to site. Importing keeps your price tied to their numbering, so every line answers the line they asked about.

اندر جاتا ہےGAEB X83 fileYour projectباہر آتا ہےLV with positionsOriginal OZ numbering
3

Cut the bill down to your trade

مقدار کا بل (BOQ)

Work through the imported LV and keep the titles and positions that belong to your trade, whether that is Trockenbau or TGA, and mark what is outside your scope. Check the quantities against your own take before you price a line.

کیوں: A Nachunternehmer prices one trade out of a bill written for the whole building. Drawing that boundary first keeps your offer comparable, and checking the quantity is what stops you carrying the planner's undermeasure at your own risk.

اندر جاتا ہےImported LVYour trade scopeباہر آتا ہےYour trade packageExclusions noted
4

Price it with your own rates

ریسورس کیٹلاگ

Price every position from your own rates and assemblies instead of somebody else's guide price: labour, material, plant and the surcharge you actually carry, each line read against its Langtext as you go.

کیوں: Your own rate is the only number you can defend when the contractor asks how you got there. Reading the Langtext while you price is where you find the scaffold, the working hours or the tolerance that would otherwise be free work.

اندر جاتا ہےUnpriced positionsYour own ratesباہر آتا ہےPriced HauptangebotQualifications noted
5

Separate Hauptangebot from Nebenangebot

مقدار کا بل (BOQ)

Keep the priced LV as your Hauptangebot, line for line as asked. Where your method really is better, copy the bill into a second LV, change only the positions your solution touches and write the reason next to each one.

کیوں: A Nebenangebot wins work when it is a clean second offer the contractor can compare position by position. Mixing the better idea into the main bill instead risks the whole offer being set aside as not answering the tender.

اندر جاتا ہےPriced HauptangebotYour better methodباہر آتا ہےHauptangebot LVNebenangebot LVReason per changed position
6

Validate both bills before they go out

تصدیق

Run both LVs through validation: no position left at zero, no quantity that no longer ties back to the X83, and the structure the return file has to honour still intact.

کیوں: A single unpriced position can void the whole submission, and nobody reads several hundred lines twice at four in the afternoon on the deadline day. Validation is the second pair of eyes that takes a minute.

اندر جاتا ہےHauptangebot LVNebenangebot LVباہر آتا ہےValidation reportGaps closed
7

Export the X84 and submit on time

GAEB تبادلہ

Export each priced LV on the export tab as its own X84, name the files so the contractor sees at a glance which one is the Hauptangebot and which the Nebenangebot, and send them with your covering letter before the Abgabefrist.

کیوں: An X84 reads straight into the contractor's bid comparison, so your prices land in the evaluation without anybody rekeying them. Two clearly named files are what let your alternate be judged rather than put aside.

اندر جاتا ہےValidated billsAbgabefristباہر آتا ہےX84 HauptangebotX84 NebenangebotSubmission on record
ماڈیولز

اس سیناریو کے ماڈیولز

5 / 184 پلیٹ فارم ماڈیولز

ٹینڈرنگ اور خریداری میں مزید

ٹینڈرنگ اور خریداری

BOQ سے ٹینڈر چلائیں

پرائسڈ بل آف کوانٹٹیز کو مارکیٹ میں لے جائیں: اسے پیکج کریں، سب کنٹریکٹرز کو مدعو کریں، ان ک…

5 مراحل12 منٹکھولیں
ٹینڈرنگ اور خریداری

BOQ سے مواد خریدیں

وہ مقداریں خریدیں جن کی آپ پہلے ہی قیمت لگا چکے ہیں: بل سے درخواست اٹھائیں، سپلائر کے ساتھ آ…

4 مراحل10 منٹکھولیں