صدور فاکتور کارهای ساختمانی تحت inversion del sujeto pasivo

جایگاه خود در زنجیره را مشخص کنید، تعیین را همراه با ماده‌ای که بر آن استوار است روی فاکتور ثبت کنید، فاکتور را با جمله قانونی و بدون مالیات بر ارزش افزوده صادر کنید، تأییدیه‌ای که آن را قابل اعمال کرده نگه دارید و آن را ظرف چهار روزی که مقام مسئول اجازه می‌دهد گزارش کنید.

5 مرحله15 دقیقهپیمانکار جزء تخصصیپیمانکار عمومیمشاوره هزینه / QS

چگونه کار می‌کند، گام به گام

5 گام در سراسر پلتفرم - کاری که در هر گام انجام می‌دهید و چرا اهمیت دارد.

1

Establish where you sit and what you are building

قراردادها

Read the contract for two facts: that there is a contract between a promotor and a contratista for the construction or refurbishment of a building, and that your own contract sits under it, directly or through another subcontract. Both have to hold before the reverse charge reaches your invoice.

چرا: The rule is about the chain, not about the trade. The same crew doing the same work is inside it on a refurbishment under a main contract and outside it on a call-out repair for the same client, and nobody notices the difference until an inspection reads the two invoices side by side.

ورودیContract and subcontract chainDescription of the worksخروجیYour position in the chainWhether the works are in scope
2

Record the determination against the invoice

مالیات تکلیفی

Create the determination for this invoice: the Spanish construction rule, the article it rests on, the sentence that goes on the document, the net amount and the fact that the buyer accounts for the VAT. The record will not leave draft while the wording is missing or a VAT amount is still sitting on it.

چرا: Per invoice rather than per customer, because the same customer can be inside the rule on one job and outside it on the next. Recorded rather than remembered, because the question that arrives in an inspection is why this invoice carried no VAT, and the answer has to be a decision with a date and an article rather than a habit.

ورودیYour position in the chainNet amount to be invoicedخروجیDetermination on recordStatutory wording on the invoice
3

Issue it with the sentence on and the VAT off

مالی

Raise the invoice for the net amount, put the statutory sentence naming the article on the face of it, and leave the VAT line empty rather than at zero percent. Reference the certificacion it answers so the two can be matched later.

چرا: An invoice with the right total and no sentence is the one that gets returned, and returning it restarts the payment clock that was the whole point of certifying on time. A zero-rate line is not the same thing as no VAT either: it says a rate was applied, which is a different tax position from the one you meant.

ورودیDetermination on recordApproved certificacionخروجیInvoice with no VAT amountRequired sentence on the document
4

Keep the confirmation that made it apply

اسناد

File the customer's written statement that they are acting as a business in this transaction, together with their tax registration details, and link it to the invoices it covers. Keep it against the contract it was given for rather than against the customer, because the same customer can be outside the rule on the next job.

چرا: The rule turns on the customer's status, and the customer is the only one who can state it. Without that statement on file the VAT you did not charge is VAT you may end up paying yourself, with the interest, years after the client has gone.

ورودیCustomer confirmed in writingTax registration recordخروجیFiled evidence documentEvidence linked to the invoice
5

Report it inside the four days

تأیید فاکتور الکترونیکی

Send the invoice record to the authority under the Spanish reporting regime and keep the acknowledgement reference against it. The invoice is valid from the moment it is issued; the report is a separate obligation with a four calendar day window, and a correction is an annulment record followed by a corrected one.

چرا: Late reporting is a penalty rather than an invalid invoice, which is exactly why it slides: nothing breaks and nobody chases it. It is also the cheapest thing on this list to keep on top of, because the window is short enough that either you have a routine or you have a fine.

ورودیIssued invoiceخروجیInvoice reported to the authorityAcknowledgement reference on record
ماژول‌ها

ماژول‌های این سناریو

5 / 190 ماژول پلتفرم

The market this case is written for

اسپانیا

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

بیشتر در بازرگانی و قراردادها

بازرگانی و قراردادها

Turn a change into a paid variation

Capture a scope change while it is fresh, price it as a contract variation on your agreed r…

3 مرحله11 دقیقهباز کردن
بازرگانی و قراردادها

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 مرحله11 دقیقهباز کردن
بازرگانی و قراردادها

Payment application and reconciliation

Value the work put in place this period against the contract, raise the application with th…

3 مرحله12 دقیقهباز کردن