Fakturirajte građevinske radove prema inversion del sujeto pasivo

Utvrdite gdje se nalazite u lancu, zabilježite određenje uz račun zajedno s člankom na kojem počiva, izdajte račun sa zakonskom formulacijom i bez PDV-a, čuvajte potvrdu koja je to učinila primjenjivim i prijavite to unutar četiri dana koje dopušta tijelo.

5 koraka15 minSpecijalizirani podizvođačGlavni izvođačKonzalting za troškove / QS

Kako funkcionira, korak po korak

5 koraka kroz platformu - što radite u svakom i zašto je važno.

1

Establish where you sit and what you are building

Ugovori

Read the contract for two facts: that there is a contract between a promotor and a contratista for the construction or refurbishment of a building, and that your own contract sits under it, directly or through another subcontract. Both have to hold before the reverse charge reaches your invoice.

Snimka zaslona, korak 1: Establish where you sit and what you are building (Ugovori, Fakturirajte građevinske radove prema inversion del sujeto pasivo)
Ugovori: Establish where you sit and what you are building

Zašto: The rule is about the chain, not about the trade. The same crew doing the same work is inside it on a refurbishment under a main contract and outside it on a call-out repair for the same client, and nobody notices the difference until an inspection reads the two invoices side by side.

UlazContract and subcontract chainDescription of the worksRezultatYour position in the chainWhether the works are in scope
2

Record the determination against the invoice

Porez po odbitku

Create the determination for this invoice: the Spanish construction rule, the article it rests on, the sentence that goes on the document, the net amount and the fact that the buyer accounts for the VAT. The record will not leave draft while the wording is missing or a VAT amount is still sitting on it.

Zašto: Per invoice rather than per customer, because the same customer can be inside the rule on one job and outside it on the next. Recorded rather than remembered, because the question that arrives in an inspection is why this invoice carried no VAT, and the answer has to be a decision with a date and an article rather than a habit.

UlazYour position in the chainNet amount to be invoicedRezultatDetermination on recordStatutory wording on the invoice
3

Issue it with the sentence on and the VAT off

Financije

Raise the invoice for the net amount, put the statutory sentence naming the article on the face of it, and leave the VAT line empty rather than at zero percent. Reference the certificacion it answers so the two can be matched later.

Snimka zaslona, korak 3: Issue it with the sentence on and the VAT off (Financije, Fakturirajte građevinske radove prema inversion del sujeto pasivo)
Financije: Issue it with the sentence on and the VAT off

Zašto: An invoice with the right total and no sentence is the one that gets returned, and returning it restarts the payment clock that was the whole point of certifying on time. A zero-rate line is not the same thing as no VAT either: it says a rate was applied, which is a different tax position from the one you meant.

UlazDetermination on recordApproved certificacionRezultatInvoice with no VAT amountRequired sentence on the document
4

Keep the confirmation that made it apply

Dokumenti

File the customer's written statement that they are acting as a business in this transaction, together with their tax registration details, and link it to the invoices it covers. Keep it against the contract it was given for rather than against the customer, because the same customer can be outside the rule on the next job.

Snimka zaslona, korak 4: Keep the confirmation that made it apply (Dokumenti, Fakturirajte građevinske radove prema inversion del sujeto pasivo)
Dokumenti: Keep the confirmation that made it apply

Zašto: The rule turns on the customer's status, and the customer is the only one who can state it. Without that statement on file the VAT you did not charge is VAT you may end up paying yourself, with the interest, years after the client has gone.

UlazCustomer confirmed in writingTax registration recordRezultatFiled evidence documentEvidence linked to the invoice
5

Report it inside the four days

Odobravanje e-računa

Send the invoice record to the authority under the Spanish reporting regime and keep the acknowledgement reference against it. The invoice is valid from the moment it is issued; the report is a separate obligation with a four calendar day window, and a correction is an annulment record followed by a corrected one.

Zašto: Late reporting is a penalty rather than an invalid invoice, which is exactly why it slides: nothing breaks and nobody chases it. It is also the cheapest thing on this list to keep on top of, because the window is short enough that either you have a routine or you have a fine.

UlazIssued invoiceRezultatInvoice reported to the authorityAcknowledgement reference on record
Moduli

Moduli u ovom playbooku

5 / 190 modula platforme

The market this case is written for

Španjolska

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Više u kategoriji Komercijala i ugovori

Komercijala i ugovori

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 koraka11 minOtvori