inversion del sujeto pasivo के तहत निर्माण कार्य का बिल बनाएं

यह पता करें कि आप श्रृंखला में कहां हैं, जिस अनुच्छेद पर यह निर्भर है उसके साथ निर्धारण को इनवॉइस के विरुद्ध दर्ज करें, वैधानिक वाक्य के साथ और बिना VAT के इनवॉइस जारी करें, वह पुष्टि रखें जिसने इसे लागू कराया और प्राधिकरण द्वारा अनुमत चार दिनों के भीतर रिपोर्ट करें।

5 चरण15 मिनटविशेषज्ञ उपठेकेदारमुख्य ठेकेदारलागत परामर्श / QS फर्म

यह कैसे काम करता है, चरण दर चरण

प्लेटफ़ॉर्म भर में 5 चरण - हर एक में आप क्या करते हैं और यह क्यों मायने रखता है।

1

Establish where you sit and what you are building

अनुबंध

Read the contract for two facts: that there is a contract between a promotor and a contratista for the construction or refurbishment of a building, and that your own contract sits under it, directly or through another subcontract. Both have to hold before the reverse charge reaches your invoice.

स्क्रीनशॉट, चरण 1: Establish where you sit and what you are building (अनुबंध, inversion del sujeto pasivo के तहत निर्माण कार्य का बिल बनाएं)
अनुबंध: Establish where you sit and what you are building

क्यों: The rule is about the chain, not about the trade. The same crew doing the same work is inside it on a refurbishment under a main contract and outside it on a call-out repair for the same client, and nobody notices the difference until an inspection reads the two invoices side by side.

इनपुटContract and subcontract chainDescription of the worksपरिणामYour position in the chainWhether the works are in scope
2

Record the determination against the invoice

कर कटौती

Create the determination for this invoice: the Spanish construction rule, the article it rests on, the sentence that goes on the document, the net amount and the fact that the buyer accounts for the VAT. The record will not leave draft while the wording is missing or a VAT amount is still sitting on it.

क्यों: Per invoice rather than per customer, because the same customer can be inside the rule on one job and outside it on the next. Recorded rather than remembered, because the question that arrives in an inspection is why this invoice carried no VAT, and the answer has to be a decision with a date and an article rather than a habit.

इनपुटYour position in the chainNet amount to be invoicedपरिणामDetermination on recordStatutory wording on the invoice
3

Issue it with the sentence on and the VAT off

फ़ाइनेंस

Raise the invoice for the net amount, put the statutory sentence naming the article on the face of it, and leave the VAT line empty rather than at zero percent. Reference the certificacion it answers so the two can be matched later.

स्क्रीनशॉट, चरण 3: Issue it with the sentence on and the VAT off (फ़ाइनेंस, inversion del sujeto pasivo के तहत निर्माण कार्य का बिल बनाएं)
फ़ाइनेंस: Issue it with the sentence on and the VAT off

क्यों: An invoice with the right total and no sentence is the one that gets returned, and returning it restarts the payment clock that was the whole point of certifying on time. A zero-rate line is not the same thing as no VAT either: it says a rate was applied, which is a different tax position from the one you meant.

इनपुटDetermination on recordApproved certificacionपरिणामInvoice with no VAT amountRequired sentence on the document
4

Keep the confirmation that made it apply

दस्तावेज़

File the customer's written statement that they are acting as a business in this transaction, together with their tax registration details, and link it to the invoices it covers. Keep it against the contract it was given for rather than against the customer, because the same customer can be outside the rule on the next job.

स्क्रीनशॉट, चरण 4: Keep the confirmation that made it apply (दस्तावेज़, inversion del sujeto pasivo के तहत निर्माण कार्य का बिल बनाएं)
दस्तावेज़: Keep the confirmation that made it apply

क्यों: The rule turns on the customer's status, and the customer is the only one who can state it. Without that statement on file the VAT you did not charge is VAT you may end up paying yourself, with the interest, years after the client has gone.

इनपुटCustomer confirmed in writingTax registration recordपरिणामFiled evidence documentEvidence linked to the invoice
5

Report it inside the four days

ई-इनवॉइस स्वीकृति

Send the invoice record to the authority under the Spanish reporting regime and keep the acknowledgement reference against it. The invoice is valid from the moment it is issued; the report is a separate obligation with a four calendar day window, and a correction is an annulment record followed by a corrected one.

क्यों: Late reporting is a penalty rather than an invalid invoice, which is exactly why it slides: nothing breaks and nobody chases it. It is also the cheapest thing on this list to keep on top of, because the window is short enough that either you have a routine or you have a fine.

इनपुटIssued invoiceपरिणामInvoice reported to the authorityAcknowledgement reference on record
मॉड्यूल

इस प्लेबुक के मॉड्यूल

प्लेटफ़ॉर्म के 190 में से 5 मॉड्यूल

The market this case is written for

स्पेन

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

वाणिज्यिक और अनुबंध में और देखें

वाणिज्यिक और अनुबंध

Turn a change into a paid variation

Capture a scope change while it is fresh, price it as a contract variation on your agreed r…

3 चरण11 मिनटखोलें
वाणिज्यिक और अनुबंध

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 चरण11 मिनटखोलें
वाणिज्यिक और अनुबंध

Payment application and reconciliation

Value the work put in place this period against the contract, raise the application with th…

3 चरण12 मिनटखोलें