टेंडर बिल की सेटलमेंट से तुलना करें

अवार्ड किए गए बिल को सेटलमेंट बिल के साथ रखें, हर बदली हुई लाइन को जोड़ी गई, हटाई गई, मात्रा बदली या दर बदली के रूप में वर्गीकृत करवाएं, हर बदलाव को उस निर्देश के साथ जोड़ें जिसने इसे उत्पन्न किया, और सूची को लिखित रूप में सहमत करें।

5 चरण16 मिनटलागत परामर्श / QS फर्मडेवलपर / क्लाइंटप्रोजेक्ट / निर्माण प्रबंधन फर्ममुख्य ठेकेदार

यह कैसे काम करता है, चरण दर चरण

प्लेटफ़ॉर्म भर में 5 चरण - हर एक में आप क्या करते हैं और यह क्यों मायने रखता है।

1

File both bills before you touch either

दस्तावेज़

Save the contract bill as awarded and the settlement bill as submitted into the project files, dated, with the covering letter that came with each.

क्यों: A settlement review is read months later by somebody who was not there, and the first question is always which two documents were compared. Filing them takes a minute now and removes an argument that otherwise has no evidence on either side.

इनपुटBill as awardedSettlement bill as submittedपरिणामBoth versions on record
2

Bring both bills in with their codes intact

मात्रा विवरण

Load each bill so both live in the project side by side, and check that the item codes came across on both. If one side lost its codes in transit, fix that before comparing rather than after.

क्यों: The item code is what makes a line the same line on both sides. With codes, a contractor who inserted twelve items and renumbered everything below them still produces a readable comparison. Without them, the match falls back to position number and the report tells you almost nothing.

इनपुटThe two filed billsपरिणामTwo bills in the projectItem codes preserved
3

Run the line-by-line comparison

मात्रा विवरण

Open the comparison on the awarded bill and pick the settlement bill as the other side. Every line comes back classified as added, removed, quantity changed, rate changed or unchanged, with the old and new quantity, rate and total, and the difference rebased into the project's currency.

क्यों: This is the part of a settlement review that consumes the days and produces none of the judgement. Getting it in one pass leaves your attention for the lines that are actually contentious, and it catches the quiet ones - a rate that moved by a few percent on a very large quantity - that eyes reading a printout do not.

इनपुटAwarded bill and settlement billपरिणामEvery line classifiedThe difference in one currency
4

Pair every movement with the instruction that caused it

परिवर्तन आदेश

Work down the moved lines with the change order register open beside them, and mark which instruction each movement answers to. The list that is left over - movements with no instruction behind them - is your query list.

क्यों: The comparison tells you what moved and the register tells you what was instructed; pairing them is judgement and stays yours. Doing it while the classified list is in front of you is what turns a settlement review into a short, specific set of questions instead of a general objection nobody can answer.

इनपुटThe lines that movedChange order registerपरिणामMovements matched to instructionsMovements with nothing behind them
5

Put the queries in writing and track the answers

पत्राचार

Issue the query list as correspondence, item by item with the amount at stake on each, and record the answer against the query rather than in somebody's inbox.

क्यों: A settlement is agreed line by line or it is not agreed at all. Queries raised in writing get answered; queries raised in a meeting get remembered differently by each side, and the difference surfaces at the worst possible moment, when the final figure is being signed.

इनपुटQuery list with amountsपरिणामQueries issued and trackedAgreed position on each line
मॉड्यूल

इस प्लेबुक के मॉड्यूल

प्लेटफ़ॉर्म के 190 में से 4 मॉड्यूल

The market this case is written for

चीन

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GB 50500
  • GB 50854

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

वाणिज्यिक और अनुबंध में और देखें

वाणिज्यिक और अनुबंध

Turn a change into a paid variation

Capture a scope change while it is fresh, price it as a contract variation on your agreed r…

3 चरण11 मिनटखोलें
वाणिज्यिक और अनुबंध

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 चरण11 मिनटखोलें
वाणिज्यिक और अनुबंध

Payment application and reconciliation

Value the work put in place this period against the contract, raise the application with th…

3 चरण12 मिनटखोलें