Price a building from a PDF
Start from a flat PDF drawing and finish with a priced, validated estimate ready to export.…
Bring an over-budget design back to target without gutting it: find the costliest elements in the bill, test cheaper options for their value, and report the savings you can defend.
3 steps across the platform - what you do at each one, and why it matters.
Sort the priced bill to see which elements carry the cost and how far the total sits above the target, so the value-engineering effort goes where the money actually is.
Why: Chasing pennies across cheap lines while the expensive elements go untouched is wasted effort. Finding the hotspots first is what points value engineering at the few changes that can actually close the gap.
For each hotspot, test the cheaper alternatives, weigh what each one saves against what it costs the scheme in quality, programme or running cost, and keep the ones that pay their way.
Why: A saving that wrecks the maintenance cost or the look of the building is not a saving. Scoring options on value, not just first cost, is what stops value engineering turning into value destruction.
Report the changes you recommend with the saving and the trade-off spelled out for each, and show the revised total against target, so the client decides on evidence rather than a bare number.
Why: A savings list with no trade-offs shown is one the client cannot make a real decision on. Laying out what each change costs as well as saves is what gets value engineering approved instead of argued over.
3 / 190 platform modules
Start from a flat PDF drawing and finish with a priced, validated estimate ready to export.…
Put a priced bill through the validation rules, clear every warning and error, then export…
Pull priced items from a real cost database, build the bill from them, bundle recurring bui…