Mga Kaso / Handover at lifecycle
Handover at lifecycle

Isara ang mga gawain at ipasa ang libro del edificio

Kunin ang pirma sa certificado final de obra, tanggapin ang acta de recepcion na may nakasulat na reservas, simulan ang tatlong panahon ng garantiya mula sa petsang iyon, buuin ang libro del edificio at ibigay sa may-ari ang mga tagubiling talagang magagamit nila para patakbuhin ang gusali.

5 hakbang20 minGeneral ContractorDeveloper / KliyenteMay-ari / Operator (FM)

Paano ito gumagana, hakbang-hakbang

5 hakbang sa buong platform - ano ang gagawin mo sa bawat isa at bakit mahalaga ito.

1

Get the certificado final de obra signed

Mga E-Lagda

Send the certificado final de obra for signature by both members of the direccion facultativa, the one who directed the works and the one who directed their execution. Keep the record of who signed and when.

Bakit: Nothing downstream can start without it: not the recepcion, not the licencia de primera ocupacion, not the release of retention. It is also the point where an outstanding item still gets fixed quickly, because everybody wants the same signature.

PapasokCompleted worksDireccion facultativa, both rolesLumalabasSigned completion certificateSignature trail with dates
2

Take the recepcion with the reservas written into it

Pagsasara

Work the closeout checklist to the point where the package is genuinely complete, then record the acta de recepcion with its date and any reservas set out item by item, along with the period allowed to clear them.

Screenshot, hakbang 2: Take the recepcion with the reservas written into it (Pagsasara, Isara ang mga gawain at ipasa ang libro del edificio)
Pagsasara: Take the recepcion with the reservas written into it

Bakit: A recepcion taken with a vague reserva about finishes is a recepcion where every later disagreement is about what was meant. Written item by item, the reserva names what is outstanding and the rest of the building is received, which is what both sides actually want.

PapasokSigned completion certificateOutstanding items listLumalabasActa de recepcion with its dateReservas written down, not agreed
3

Start the guarantee periods from that date

Mga Warranty at Defects Liability

Enter the guarantee periods by hand against the recepcion date: twelve months for defects in the finishes, thirty-six for those affecting habitability, one hundred and twenty for those touching structure. The register ships no Spanish regime, so leave the regime unset and let the period you entered stand as entered.

Screenshot, hakbang 3: Start the guarantee periods from that date (Mga Warranty at Defects Liability, Isara ang mga gawain at ipasa ang libro del edificio)
Mga Warranty at Defects Liability: Start the guarantee periods from that date

Bakit: The three periods are the reason a defect reported in year four is a different conversation from the same defect in year two, and nobody reconstructs that from memory. Entered as dates, the register answers it; left to be worked out later, it becomes an argument between people who each remember a different rule.

PapasokActa de recepcion dateElements and work packagesLumalabasWarranty register entriesGuarantee end dates on record
4

Assemble the libro del edificio

Mga Dokumento

Gather what the libro has to carry: the project as built, the acta de recepcion, the list of the parties who took part with their details, the certificates and guarantees, and the instructions for use and maintenance. File it as one indexed set rather than as a folder somebody has to interpret.

Screenshot, hakbang 4: Assemble the libro del edificio (Mga Dokumento, Isara ang mga gawain at ipasa ang libro del edificio)
Mga Dokumento: Assemble the libro del edificio

Bakit: The libro is read by people who were not there, years later, usually because something has failed. An index that says what is inside is what turns it from an archive into a document, and the party list is what tells the community who to write to when the ten-year period still has time on it.

PapasokAs-built drawings and project fileCertificates and guaranteesLumalabasLibro del edificio document packIndex of what is inside it
5

Hand over instructions the owner can run the building on

Ari-arian ng Gusali (FM)

Load the plant and equipment into the asset register with its location, its guarantee end date and the maintenance the instructions require, so the use and maintenance section of the libro becomes a list of things due rather than a chapter.

Screenshot, hakbang 5: Hand over instructions the owner can run the building on (Ari-arian ng Gusali (FM), Isara ang mga gawain at ipasa ang libro del edificio)
Ari-arian ng Gusali (FM): Hand over instructions the owner can run the building on

Bakit: A guarantee is lost far more often through maintenance nobody did than through a defect nobody reported. The register is what makes the difference visible in the first year, while the periods still have most of their time left and the contractor is still answering the phone.

PapasokLibro del edificio document packInstalled plant and equipmentLumalabasAsset register the owner can useMaintenance schedule per asset
Mga Module

Mga Module sa Playbook na Ito

5 / 190 na module ng platform

The market this case is written for

Spain

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Higit pa sa Handover at lifecycle

Handover at lifecycle

Hand over and close out

Finish the job cleanly: work the punch list to zero, confirm every inspection passed and no…

5 hakbang14 minBukas
Handover at lifecycle

As-built and O and M handover

Pull the as-built record together, prove the quality file has no gaps, then issue an operat…

3 hakbang12 minBukas