Panatilihin ang libro de ordenes na sinusulatan ng direccion facultativa

Itala ang pagbisita, isulat ang bawat utos ayon sa kung ano talaga ito, itugma ito sa sariling talaan ng kontratista para sa araw na iyon, at ipadala ang mga nagbabago sa trabaho sa isang napresyuhang modificado sa halip na sa isang usapan.

5 hakbang14 minGeneral ContractorDesign / Engineering PracticeProject / Construction Management Firm

Paano ito gumagana, hakbang-hakbang

5 hakbang sa buong platform - ano ang gagawin mo sa bawat isa at bakit mahalaga ito.

1

Open the visit before you write anything

Superbisyon sa Site

Record the visit itself: the date, who attended and in which discipline they attended. Every order written that day hangs off it, so the visit is the container rather than the paperwork.

Screenshot, hakbang 1: Open the visit before you write anything (Superbisyon sa Site, Panatilihin ang libro de ordenes na sinusulatan ng direccion facultativa)
Superbisyon sa Site: Open the visit before you write anything

Bakit: An instruction with no visit behind it is an instruction nobody can place. Which arquitecto tecnico was there, and whether the structural engineer was, decides later whether an order about reinforcement was given by somebody entitled to give it.

PapasokWorks in progressApproved drawings and specificationLumalabasDated site visit recordAttendance record by discipline
2

Write each order as the kind of thing it is

Superbisyon sa Site

Enter each observation under its own number and say which kind it is: work confirmed as conforming, a deviation from the project, an acceptance of work about to be covered up, an instruction to do something, or a reasoned refusal. Name the element, the location and the action required.

Bakit: The type is what decides who has to do what next, and it is the thing free prose loses. A hidden-works acceptance that reads like a general comment is an acceptance nobody can find once the slab is poured, and that is exactly the record everybody wants when the slab is opened again.

PapasokOpen site visit recordWhat was observed on siteLumalabasNumbered order in the registerRequired action and its status
3

Pair the order with the day it was given

Pang-araw-araw na Talaarawan

On the same day, record in the diary what was on site: which trades, how many, what plant, the weather and what was actually built. Note the order reference in it so the two records point at each other.

Screenshot, hakbang 3: Pair the order with the day it was given (Pang-araw-araw na Talaarawan, Panatilihin ang libro de ordenes na sinusulatan ng direccion facultativa)
Pang-araw-araw na Talaarawan: Pair the order with the day it was given

Bakit: An order to stop and rework is worth whatever the stop cost, and that cost is in the diary rather than in the order. Six months later the two together are evidence; the order on its own is a sentence, and the diary on its own is a page of crew numbers nobody can attribute to anything.

PapasokOrder given that daySite labour, plant and weatherLumalabasDaily diary recordOrder matched to the day's works
4

Send the ones that change the work to be priced

Mga Variation

An instruction or a deviation that alters the scope becomes a variation, priced from the contract rates where they reach and from a new descompuesto where they do not, with the order reference carried on it.

Screenshot, hakbang 4: Send the ones that change the work to be priced (Mga Variation, Panatilihin ang libro de ordenes na sinusulatan ng direccion facultativa)
Mga Variation: Send the ones that change the work to be priced

Bakit: Orders that change the work and never get priced are the single largest source of unpaid work on a Spanish job, and they are never denied at the time. They are denied at the end, when the only argument left is what somebody meant, and the reference from the order to the priced change is what stops that argument existing.

PapasokInstruction that changes the workContract rates and quantitiesLumalabasPriced variation raisedOrder linked to the change record
5

Take the open orders to the monthly meeting

Mga Ulat

Report the orders still open, how long each has been open and who owes the next move, and take that list into the site meeting instead of reading the whole register out.

Screenshot, hakbang 5: Take the open orders to the monthly meeting (Mga Ulat, Panatilihin ang libro de ordenes na sinusulatan ng direccion facultativa)
Mga Ulat: Take the open orders to the monthly meeting

Bakit: An order nobody chases is closed by the passage of time, and both sides read that silence in their own favour. A short list of what is still open, tabled once a month, closes most of them without any escalation at all, and the ones that do not close are the real disputes rather than the forgotten ones.

PapasokOrders open and closedLumalabasReport of open ordersAgenda for the next site meeting
Mga Module

Mga Module sa Playbook na Ito

4 / 190 na module ng platform

The market this case is written for

Spain

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Higit pa sa Site at field

Site at field

Run the site day

Close the day out properly: record the diary, book the labour and plant hours, upload the p…