Run a toolbox talk and record attendance

Plan a short safety briefing for the day, high-risk activity, deliver it to the crew, capture who attended and the topic, and file the record as provable evidence the briefing happened.

5 steps9 minGeneral contractorSpecialist subcontractor

How it works, step by step

5 steps across the platform - what you do at each one, and why it matters.

1

Pick the activity and hazard

Safety

Look at the work planned for today and pick the highest-risk activity, then note the main hazard the crew will face, working at height, lifting, hot works, live services or whatever leads the day.

Safety screen in OpenConstructionERP: Pick the activity and hazard (Run a toolbox talk and record attendance)
Safety: Pick the activity and hazard

Why: A toolbox talk only works when it is about the job in front of the crew that morning. Tying it to a real activity and a real hazard is what makes the crew listen instead of nod through it.

InDaily work planKnown site hazardsOutSelected high-risk activityMain hazard identified
2

Prepare the talk

Safety

Write a few clear points for the talk, the hazard, the controls in place, the protective equipment needed and what to do if something goes wrong, so you can deliver it in a couple of minutes.

Why: A short prepared talk lands better than an off-the-cuff one. Having the controls written down means nothing important gets forgotten in front of the crew.

InSelected activityIdentified hazardOutPrepared talk pointsControls & PPE list
3

Deliver and capture attendance

Field time

Gather the crew, give the talk, then log who was present against the topic and the date so every name on shift is tied to the briefing they received.

Field time screen in OpenConstructionERP: Deliver and capture attendance (Run a toolbox talk and record attendance)
Field time: Deliver and capture attendance

Why: Attendance is the proof. If an incident is investigated later, the record of who was briefed on what protects both the worker and the site.

InPrepared talkCrew on shiftOutAttendance recordTopic & date logged
4

File the record in the daily diary

Daily diary

Enter the talk in the daily diary with the topic, the crew present and the time, so it sits alongside the rest of the day, record for the site.

Daily diary screen in OpenConstructionERP: File the record in the daily diary (Run a toolbox talk and record attendance)
Daily diary: File the record in the daily diary

Why: A briefing that lives only in someone, memory did not happen as far as anyone else is concerned. Filing it in the daily record makes it part of the permanent, auditable history of the project.

InAttendance recordTalk topicOutDaily diary entryAuditable safety record
5

Follow up any action

Safety

If the talk raised a missing control, a broken tool or a gap in equipment, raise it as an action with an owner and a date and check it is closed before the activity runs.

Safety screen in OpenConstructionERP: Follow up any action (Run a toolbox talk and record attendance)
Safety: Follow up any action

Why: A talk that surfaces a hazard and then does nothing about it is worse than no talk, because the risk is now known and unmanaged. Following the action through is what actually keeps the crew safe.

InGaps raised in talkDiary recordOutAssigned safety actionAction closed before work
Modules

Modules in this playbook

3 / 190 platform modules

More in Site & field

Site & field

Run the site day

Close the day out properly: record the diary, book the labour and plant hours, upload the p…