תרחישים / מכרזים ורכש
מכרזים ורכש

הכנת מחיר הביקורת של המכרז ותמחור הצעה

טענו בסיס עלויות ארצי, בנו ממנו תעריפים מבוססי מכסות כדי להכין את מחיר הביקורת של המזמין, תמחרו את אותו כתב כמויות לפי מחירי השוק שלכם, והשוו בין השניים לפני שמישהו מקצה משהו.

5 שלבים24 דק׳ייעוץ עלויות / כמויותיזם / לקוחקבלן ראשימשרד ניהול פרויקטים / בנייה

איך זה עובד, שלב אחר שלב

5 שלבים לאורך הפלטפורמה - מה עושים בכל שלב ולמה זה חשוב.

1

Load the cost base you are going to price from

מאגר עלות

Bring a cost base into the cost database through the ordinary import surface and check it landed with its work items, units and currency intact. A Chinese national base built from the official norm system is one of the families available to load; a provincial quota book is something you bring yourself.

למה: A control price is only defensible if everybody can see which base it was compiled from. Loading it as data rather than transcribing rates out of a book means the base is named, versioned and re-pricable later, instead of living as a column somebody typed in once.

נכנסPublished national cost baseיוצאCost base loaded and searchablePriced in CNY
2

Expand a norm into hours and materials, then price it

נורמות ייצור

Take a norm, enter the bill's quantity and see the unpriced labour hours, machine hours and material takeoff behind it. Price those with the base's rates, and save the result as an assembly you can reuse across the bill.

למה: This is what quota pricing actually is, and seeing it expanded is what makes a control price arguable rather than merely quoted. It is also where you notice that a norm assumes a method your site cannot use, which is a finding worth having before the ceiling is published rather than after a bidder challenges it.

נכנסNorm for the work itemQuantity from the billיוצאLabour and machine hoursQuota-based rate
3

Compile the control price on the tender bill

כתב כמויות

Price the tender bill through with the quota-based rates, keeping the item codes and descriptions exactly as they will be issued to bidders, and add the bill-level heads on top of the item totals.

למה: The control price and the bill the bidders receive have to be the same document with one column filled differently, or the comparison at the end is between two different scopes. Compiling it on the issued bill rather than on a working copy is what guarantees that.

נכנסThe coded tender billQuota-based ratesיוצאControl price on the bill
4

Hold the quota rate against the market rate

סייר עלויות

Compare the base you compiled from against your own rates, trade by trade, and look for the items where the two disagree most. Those are the items that decide the job.

למה: A quota rate is an average of a method; a market rate is a quotation from this year. Where they are close, the item is uninteresting whoever prices it. Where they are far apart, either the norm assumes something your site does not do, or somebody is about to bid work they cannot deliver, and both are worth knowing before the envelope is opened.

נכנסQuota-based ratesYour own market ratesיוצאWhere the two bases disagree
5

Read the bids against the control price and write down why

מכרזים

Put the bids side by side in the tender evaluation and read each one against the control price you compiled, section by section rather than only on the total. Record the reasoning that leads to your recommendation, including which items you queried and what the answer was.

למה: The comparison is yours to make and yours to justify; nothing here rejects a bid on your behalf, and it should not. On public work the reasoning is read months later by somebody who was not in the room, and a written comparison against a stated base is the difference between an award that survives a challenge and one that is defended from memory.

נכנסBids on the same billThe compiled control priceיוצאBids read against the control priceThe reasoning on the record
מודולים

המודולים בתרחיש הזה

5 מתוך 190 מודולי הפלטפורמה

The market this case is written for

סין

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GB 50500
  • GB 50854

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

עוד ב-מכרזים ורכש

מכרזים ורכש

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 שלבים12 דק׳פתיחה
מכרזים ורכש

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 שלבים10 דק׳פתיחה
מכרזים ורכש

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 שלבים12 דק׳פתיחה