سناریوها / مناقصه‌گذاری و تدارکات
مناقصه‌گذاری و تدارکات

تدوین قیمت کنترلی مناقصه و قیمت‌گذاری یک پیشنهاد

یک پایگاه هزینه ملی بارگذاری کنید، از آن نرخ‌های مبتنی بر سهمیه بسازید تا قیمت کنترلی کارفرما را تدوین کنید، همان صورت مقادیر را با نرخ‌های بازار خودتان قیمت‌گذاری کنید، و پیش از واگذاری هر چیزی، این دو را در برابر هم بخوانید.

5 مرحله24 دقیقهمشاوره هزینه / QSسازنده / کارفرماپیمانکار عمومیدفتر مدیریت پروژه / ساخت

چگونه کار می‌کند، گام به گام

5 گام در سراسر پلتفرم - کاری که در هر گام انجام می‌دهید و چرا اهمیت دارد.

1

Load the cost base you are going to price from

پایگاه داده هزینه

Bring a cost base into the cost database through the ordinary import surface and check it landed with its work items, units and currency intact. A Chinese national base built from the official norm system is one of the families available to load; a provincial quota book is something you bring yourself.

چرا: A control price is only defensible if everybody can see which base it was compiled from. Loading it as data rather than transcribing rates out of a book means the base is named, versioned and re-pricable later, instead of living as a column somebody typed in once.

ورودیPublished national cost baseخروجیCost base loaded and searchablePriced in CNY
2

Expand a norm into hours and materials, then price it

نُرم‌های تولید

Take a norm, enter the bill's quantity and see the unpriced labour hours, machine hours and material takeoff behind it. Price those with the base's rates, and save the result as an assembly you can reuse across the bill.

چرا: This is what quota pricing actually is, and seeing it expanded is what makes a control price arguable rather than merely quoted. It is also where you notice that a norm assumes a method your site cannot use, which is a finding worth having before the ceiling is published rather than after a bidder challenges it.

ورودیNorm for the work itemQuantity from the billخروجیLabour and machine hoursQuota-based rate
3

Compile the control price on the tender bill

صورت مقادیر (BOQ)

Price the tender bill through with the quota-based rates, keeping the item codes and descriptions exactly as they will be issued to bidders, and add the bill-level heads on top of the item totals.

چرا: The control price and the bill the bidders receive have to be the same document with one column filled differently, or the comparison at the end is between two different scopes. Compiling it on the issued bill rather than on a working copy is what guarantees that.

ورودیThe coded tender billQuota-based ratesخروجیControl price on the bill
4

Hold the quota rate against the market rate

کاوشگر هزینه

Compare the base you compiled from against your own rates, trade by trade, and look for the items where the two disagree most. Those are the items that decide the job.

چرا: A quota rate is an average of a method; a market rate is a quotation from this year. Where they are close, the item is uninteresting whoever prices it. Where they are far apart, either the norm assumes something your site does not do, or somebody is about to bid work they cannot deliver, and both are worth knowing before the envelope is opened.

ورودیQuota-based ratesYour own market ratesخروجیWhere the two bases disagree
5

Read the bids against the control price and write down why

مناقصه‌گذاری

Put the bids side by side in the tender evaluation and read each one against the control price you compiled, section by section rather than only on the total. Record the reasoning that leads to your recommendation, including which items you queried and what the answer was.

چرا: The comparison is yours to make and yours to justify; nothing here rejects a bid on your behalf, and it should not. On public work the reasoning is read months later by somebody who was not in the room, and a written comparison against a stated base is the difference between an award that survives a challenge and one that is defended from memory.

ورودیBids on the same billThe compiled control priceخروجیBids read against the control priceThe reasoning on the record
ماژول‌ها

ماژول‌های این سناریو

5 / 190 ماژول پلتفرم

The market this case is written for

چین

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GB 50500
  • GB 50854

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

بیشتر در مناقصه‌گذاری و تدارکات

مناقصه‌گذاری و تدارکات

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 مرحله12 دقیقهباز کردن
مناقصه‌گذاری و تدارکات

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 مرحله10 دقیقهباز کردن
مناقصه‌گذاری و تدارکات

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 مرحله12 دقیقهباز کردن