टेंडर कंट्रोल प्राइस तैयार करें और एक बिड की कीमत तय करें

एक राष्ट्रीय लागत आधार लोड करें, इससे कोटा-आधारित दरें बनाकर मालिक की कंट्रोल प्राइस तैयार करें, उसी बिल की कीमत अपनी बाजार दरों पर तय करें, और किसी भी अवार्ड से पहले दोनों को एक-दूसरे के विरुद्ध पढ़ें।

5 चरण24 मिनटलागत परामर्श / QS फर्मडेवलपर / क्लाइंटमुख्य ठेकेदारप्रोजेक्ट / निर्माण प्रबंधन फर्म

यह कैसे काम करता है, चरण दर चरण

प्लेटफ़ॉर्म भर में 5 चरण - हर एक में आप क्या करते हैं और यह क्यों मायने रखता है।

1

Load the cost base you are going to price from

लागत डेटाबेस

Bring a cost base into the cost database through the ordinary import surface and check it landed with its work items, units and currency intact. A Chinese national base built from the official norm system is one of the families available to load; a provincial quota book is something you bring yourself.

स्क्रीनशॉट, चरण 1: Load the cost base you are going to price from (लागत डेटाबेस, टेंडर कंट्रोल प्राइस तैयार करें और एक बिड की कीमत तय करें)
लागत डेटाबेस: Load the cost base you are going to price from

क्यों: A control price is only defensible if everybody can see which base it was compiled from. Loading it as data rather than transcribing rates out of a book means the base is named, versioned and re-pricable later, instead of living as a column somebody typed in once.

इनपुटPublished national cost baseपरिणामCost base loaded and searchablePriced in CNY
2

Expand a norm into hours and materials, then price it

उत्पादन मानदंड

Take a norm, enter the bill's quantity and see the unpriced labour hours, machine hours and material takeoff behind it. Price those with the base's rates, and save the result as an assembly you can reuse across the bill.

स्क्रीनशॉट, चरण 2: Expand a norm into hours and materials, then price it (उत्पादन मानदंड, टेंडर कंट्रोल प्राइस तैयार करें और एक बिड की कीमत तय करें)
उत्पादन मानदंड: Expand a norm into hours and materials, then price it

क्यों: This is what quota pricing actually is, and seeing it expanded is what makes a control price arguable rather than merely quoted. It is also where you notice that a norm assumes a method your site cannot use, which is a finding worth having before the ceiling is published rather than after a bidder challenges it.

इनपुटNorm for the work itemQuantity from the billपरिणामLabour and machine hoursQuota-based rate
3

Compile the control price on the tender bill

मात्रा विवरण

Price the tender bill through with the quota-based rates, keeping the item codes and descriptions exactly as they will be issued to bidders, and add the bill-level heads on top of the item totals.

स्क्रीनशॉट, चरण 3: Compile the control price on the tender bill (मात्रा विवरण, टेंडर कंट्रोल प्राइस तैयार करें और एक बिड की कीमत तय करें)
मात्रा विवरण: Compile the control price on the tender bill

क्यों: The control price and the bill the bidders receive have to be the same document with one column filled differently, or the comparison at the end is between two different scopes. Compiling it on the issued bill rather than on a working copy is what guarantees that.

इनपुटThe coded tender billQuota-based ratesपरिणामControl price on the bill
4

Hold the quota rate against the market rate

Cost Explorer

Compare the base you compiled from against your own rates, trade by trade, and look for the items where the two disagree most. Those are the items that decide the job.

क्यों: A quota rate is an average of a method; a market rate is a quotation from this year. Where they are close, the item is uninteresting whoever prices it. Where they are far apart, either the norm assumes something your site does not do, or somebody is about to bid work they cannot deliver, and both are worth knowing before the envelope is opened.

इनपुटQuota-based ratesYour own market ratesपरिणामWhere the two bases disagree
5

Read the bids against the control price and write down why

निविदा

Put the bids side by side in the tender evaluation and read each one against the control price you compiled, section by section rather than only on the total. Record the reasoning that leads to your recommendation, including which items you queried and what the answer was.

स्क्रीनशॉट, चरण 5: Read the bids against the control price and write down why (निविदा, टेंडर कंट्रोल प्राइस तैयार करें और एक बिड की कीमत तय करें)
निविदा: Read the bids against the control price and write down why

क्यों: The comparison is yours to make and yours to justify; nothing here rejects a bid on your behalf, and it should not. On public work the reasoning is read months later by somebody who was not in the room, and a written comparison against a stated base is the difference between an award that survives a challenge and one that is defended from memory.

इनपुटBids on the same billThe compiled control priceपरिणामBids read against the control priceThe reasoning on the record
मॉड्यूल

इस प्लेबुक के मॉड्यूल

प्लेटफ़ॉर्म के 190 में से 5 मॉड्यूल

The market this case is written for

चीन

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GB 50500
  • GB 50854

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

निविदा और खरीद में और देखें

निविदा और खरीद

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 चरण12 मिनटखोलें
निविदा और खरीद

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 चरण10 मिनटखोलें
निविदा और खरीद

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 चरण12 मिनटखोलें