Import a programme and set the baseline

Bring an external programme in from an exchange file, check the calendars and links survived the trip, set the accepted programme as the baseline and publish it so progress is measured against something fixed.

4 pasos10 minContratista generalGerente de proyecto / construcciónSubcontratista especializado

Cómo funciona, paso a paso

4 pasos a lo largo de la plataforma - qué haces en cada uno y por qué importa.

1

Import the programme

Cronograma avanzado

Import the programme from its exchange file so the activities, durations, logic links and WBS come across without being rekeyed line by line.

Por que: Retyping a programme of a few hundred activities loses the logic that makes it a programme. Importing keeps the network intact so the critical path is real, not redrawn from memory.

EntradaProgramme exchange fileResultadoImported activities
2

Check what came across

Cronograma avanzado

Confirm the calendars, the logic links and the WBS survived the import, and that the completion date matches the source, before anyone trusts a date on it.

Por que: Exchange files drop constraints and remap calendars silently. Catching a shifted completion date now is far cheaper than discovering the imported programme was wrong three months in.

EntradaImported activitiesCalendars and linksResultadoChecked programme
3

Set the baseline

Cronograma 4D

Freeze the agreed programme as the baseline, the fixed reference the job will be measured against for the rest of its life.

Por que: The baseline is the promise. Without a frozen one there is nothing to compare progress to, and every slippage argument becomes a matter of opinion instead of a matter of record.

EntradaChecked programmeResultadoFixed baseline
4

Publish it for tracking

Avance

Publish the baseline so the team records progress against it and the planned-versus-actual picture builds from day one.

Por que: A baseline nobody tracks against is a wall decoration. Publishing it turns the programme into a live control that warns you early rather than a document reviewed after the fact.

EntradaFixed baselineResultadoProgress tracking on