Import a programme and set the baseline

Bring an external programme in from an exchange file, check the calendars and links survived the trip, set the accepted programme as the baseline and publish it so progress is measured against something fixed.

4단계10 분종합건설사PM/CM 업체전문건설사

작동 방식, 단계별로

플랫폼 전반에 걸친 4단계 - 각 단계에서 무엇을 하는지, 그리고 왜 중요한지.

1

Import the programme

고급 일정

Import the programme from its exchange file so the activities, durations, logic links and WBS come across without being rekeyed line by line.

이유: Retyping a programme of a few hundred activities loses the logic that makes it a programme. Importing keeps the network intact so the critical path is real, not redrawn from memory.

입력Programme exchange file결과Imported activities
2

Check what came across

고급 일정

Confirm the calendars, the logic links and the WBS survived the import, and that the completion date matches the source, before anyone trusts a date on it.

이유: Exchange files drop constraints and remap calendars silently. Catching a shifted completion date now is far cheaper than discovering the imported programme was wrong three months in.

입력Imported activitiesCalendars and links결과Checked programme
3

Set the baseline

4D 공정표

Freeze the agreed programme as the baseline, the fixed reference the job will be measured against for the rest of its life.

이유: The baseline is the promise. Without a frozen one there is nothing to compare progress to, and every slippage argument becomes a matter of opinion instead of a matter of record.

입력Checked programme결과Fixed baseline
4

Publish it for tracking

진척

Publish the baseline so the team records progress against it and the planned-versus-actual picture builds from day one.

이유: A baseline nobody tracks against is a wall decoration. Publishing it turns the programme into a live control that warns you early rather than a document reviewed after the fact.

입력Fixed baseline결과Progress tracking on