Write the basis of estimate
Capture the assumptions, inclusions, exclusions and qualifications behind a price and issue them with the number, so it is read in context instead of as a bare figure.
วิธีการทำงาน ทีละขั้นตอน
4 ขั้นตอนทั่วทั้งแพลตฟอร์ม - สิ่งที่คุณทำในแต่ละขั้นและเหตุผลที่สำคัญ
Capture the assumptions
หลักเกณฑ์การประมาณราคาRecord which drawings and revisions you priced, the method and programme you assumed, the ground and access you took for granted, and every gap you filled with a judgement.
เหตุผล: The assumptions are where the risk lives. Writing them down turns a silent bet into an agreed position and gives you the ground to stand on when the design that lands is not the one you priced.
List inclusions and exclusions
หลักเกณฑ์การประมาณราคาSet out plainly what the price includes, what it excludes and the qualifications that condition it, so there is no doubt on either side about what was bought.
เหตุผล: Most disputes are not about the rate, they are about whether an item was in or out. A clear inclusions and exclusions list settles that before it becomes a variation argument.
Link it to the bill
ปริมาณงาน (BOQ)Tie the basis to the bill it explains, so anyone opening the price can read the assumptions that produced it without hunting through email.
เหตุผล: A basis that lives apart from the bill gets lost. Kept together, the two travel through review, award and delivery as one story about what was priced and why.
Issue it with the price
รายงานIssue the basis alongside the price in the estimate report, so the client reads the number and the ground it stands on at the same time.
เหตุผล: A number sent on its own gets treated as gospel and then disputed. Sent with its basis, it invites the right conversation about scope and risk before anyone commits.