Write the basis of estimate

Capture the assumptions, inclusions, exclusions and qualifications behind a price and issue them with the number, so it is read in context instead of as a bare figure.

4 个步骤9 分钟造价咨询 / 工料测量师总承包商专业分包商

运作方式,逐步说明

贯穿平台的 4 个步骤 - 每一步做什么,以及为什么重要。

1

Capture the assumptions

估算依据

Record which drawings and revisions you priced, the method and programme you assumed, the ground and access you took for granted, and every gap you filled with a judgement.

原因: The assumptions are where the risk lives. Writing them down turns a silent bet into an agreed position and gives you the ground to stand on when the design that lands is not the one you priced.

输入Documents pricedInformation gaps成果Stated assumptions
2

List inclusions and exclusions

估算依据

Set out plainly what the price includes, what it excludes and the qualifications that condition it, so there is no doubt on either side about what was bought.

原因: Most disputes are not about the rate, they are about whether an item was in or out. A clear inclusions and exclusions list settles that before it becomes a variation argument.

输入Priced scope成果Inclusions and exclusionsQualifications
3

Link it to the bill

工程量清单

Tie the basis to the bill it explains, so anyone opening the price can read the assumptions that produced it without hunting through email.

原因: A basis that lives apart from the bill gets lost. Kept together, the two travel through review, award and delivery as one story about what was priced and why.

输入Basis documentPriced bill成果Basis linked to bill
4

Issue it with the price

报告

Issue the basis alongside the price in the estimate report, so the client reads the number and the ground it stands on at the same time.

原因: A number sent on its own gets treated as gospel and then disputed. Sent with its basis, it invites the right conversation about scope and risk before anyone commits.

输入Bill and basis成果Issued together