Manage the defects liability period after occupation

Once the building is occupied, log every reported defect against the contractor and a due date, and drive the list to zero before the liability period closes.

3 steps9 minOwner / operator (FM)General contractorProject / construction manager

How it works, step by step

3 steps across the platform - what you do at each one, and why it matters.

1

Log the reported defect

Punch list

Add the defect reported by the occupier to the punch list with its location, a photo and the contractor or subcontractor responsible for the fix.

Why: A defect reported to a caretaker by phone and never written down is a defect that never gets fixed. One list keeps every claim against the liability period visible.

InOccupier defect reportLocation and photoOutLogged defect entryResponsible contractor
2

Assign it and set a due date

Punch list

Assign the item to the contractor obliged to fix it under the defects clause, set a due date inside the liability period, and track it until it is marked done.

Why: The liability period has a hard end date, and a defect still open when it closes becomes a cost the owner absorbs. Assigning and dating each one is what keeps the obligation enforceable.

InLogged defectDefects clauseOutAssigned contractorDue date set
3

Close the period clean

Close-out

At the end of the defects liability period, confirm every item on the list is closed and issue the final certificate releasing the last retention.

Why: A clean close at the end of the liability period is what finally discharges the contractor obligation and releases the retention held against it.

InClosed defect listHeld retentionOutFinal certificateReleased retention