Hand over and close out
Finish the job cleanly: work the punch list to zero, confirm every inspection passed and no…
Once the building is occupied, log every reported defect against the contractor and a due date, and drive the list to zero before the liability period closes.
3 steps across the platform - what you do at each one, and why it matters.
Add the defect reported by the occupier to the punch list with its location, a photo and the contractor or subcontractor responsible for the fix.
Why: A defect reported to a caretaker by phone and never written down is a defect that never gets fixed. One list keeps every claim against the liability period visible.
Assign the item to the contractor obliged to fix it under the defects clause, set a due date inside the liability period, and track it until it is marked done.
Why: The liability period has a hard end date, and a defect still open when it closes becomes a cost the owner absorbs. Assigning and dating each one is what keeps the obligation enforceable.
At the end of the defects liability period, confirm every item on the list is closed and issue the final certificate releasing the last retention.
Why: A clean close at the end of the liability period is what finally discharges the contractor obligation and releases the retention held against it.
2 / 184 platform modules
Finish the job cleanly: work the punch list to zero, confirm every inspection passed and no…
Pull the as-built record together, prove the quality file has no gaps, then issue an operat…
Walk the finished works with the client, record what passes and what does not against the a…