Level bids to a common scope

Normalise structurally different bids - filling the scope gaps and pricing the qualifications - so every offer sits on the same basis before you compare the bottom lines and pick the real lowest.

4 خطوة12 دقيقةمقاول عاماستشاري تكاليف / مساح كمياتمدير مشروع / مدير إنشاء

كيف يعمل، خطوة بخطوة

4 خطوات عبر المنصة - ما تفعله في كل منها ولماذا يهم.

1

Collect the bids

إدارة العطاءات

Gather every returned bid with the covering letter, the priced schedule and the qualifications each firm attached, so nothing that conditions a price is left in an inbox.

لماذا: The qualifications are where the real differences hide. A bid read without its conditions is a number without a meaning, and half the leveling work is just finding them.

المدخلاتReturned bidsQualificationsالمخرجاتBid set assembled
2

Map each bid to the scope

إدارة العطاءات

Set each bid against the common scope and flag what is missing, what is extra and where a firm has priced something different from what was asked.

لماذا: A gap you spot now is a negotiation; a gap you miss becomes a variation the day after award. Mapping to a single scope is what turns apples and oranges back into apples.

المدخلاتBid setCommon scopeالمخرجاتScope gaps flagged
3

Adjust to one basis

إدارة العطاءات

Price the gaps and the qualifications into each bid as adjustments, so every offer is restated as what it would cost to deliver the full common scope.

لماذا: Adjusting rather than disqualifying keeps a strong contractor in the race even if their bid was scrappy. It is the fairest and the sharpest way to find the true lowest cost.

المدخلاتScope gapsالمخرجاتLevelled bids
4

Compare and recommend

المناقصات

Compare the levelled bids against each other and the budget, then write the recommendation on the offer that is genuinely lowest for the full scope, not just cheapest on paper.

لماذا: A recommendation built on levelled numbers survives challenge. It shows the client you compared like for like and awarded on value rather than on whoever forgot the most.

المدخلاتLevelled bidsBudget baselineالمخرجاتAward recommendation