Cases / Handover & lifecycle
Handover & lifecycle

Get a key document signed off

Pick the document that needs formal sign-off, open a signing session with the right signatories, collect their attestations, and download the signed manifest as the record.

4 steps8 minGeneral contractorProject / construction management firmOwner / operator (FM)

How it works, step by step

4 steps across the platform - what you do at each one, and why it matters.

1

Pick the document

Documents

Find the final version of the certificate, statement or agreement that needs signing, and confirm it is the one everyone has actually agreed to, not an earlier draft.

Documents screen in OpenConstructionERP: Pick the document (Get a key document signed off)
Documents: Pick the document

Why: A signature on the wrong version is worse than no signature at all, it looks final while it is not. Confirming the exact document first is what the rest of the sign-off depends on.

InDocuments awaiting sign-offOutSelected document
2

Open the session and add signatories

E-Signatures

Start a signing session on the document, add every party who needs to sign in the right order, and send it out.

E-Signatures screen in OpenConstructionERP: Open the session and add signatories (Get a key document signed off)
E-Signatures: Open the session and add signatories

Why: Chasing signatures over email loses track of who has actually signed and who is still sitting on it. A session with a fixed signatory list is what lets you see the gap at a glance.

InSelected documentOutSigning session
3

Collect the attestations

E-Signatures

Track each signatory as they sign, follow up the ones still outstanding, and let the session capture the time and identity behind every signature.

Why: A signature with no timestamp or identity behind it is easy to dispute later. Capturing both as part of the session is what makes the sign-off actually evidential.

InSigning sessionOutRecorded attestations
4

Download the signed manifest

E-Signatures

Once every signatory has signed, download the manifest that binds the document to its signatures and file it with the project record.

Why: The manifest is the piece that outlives the session, it is what you hand to a client, an auditor or a court years later. Filing it now is easier than trying to reconstruct the trail after the fact.

InRecorded attestationsOutSigned manifest
Modules

Modules in this playbook

2 / 190 platform modules

More in Handover & lifecycle

Handover & lifecycle

Hand over and close out

Finish the job cleanly: work the punch list to zero, confirm every inspection passed and no…

5 steps14 minOpen
Handover & lifecycle

As-built and O and M handover

Pull the as-built record together, prove the quality file has no gaps, then issue an operat…

3 steps12 minOpen