Set up a project and hand it over
Take a job from the very first setup right through to handover. Create it, price the work,…
Real, end-to-end workflows a construction team actually runs - estimating, tendering, BIM, site, commercial and handover. Each one is a worked example you can open in the live demo and follow step by step, with what to do and why at every stage.
Take a job from the very first setup right through to handover. Create it, price the work,…
Put a priced bill through the validation rules, clear every warning and error, then export…
Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…
Buy the quantities you already priced: raise a requisition off the bill, place the order wi…
Turn a converted BIM model into an embodied carbon footprint. Auto-enrich reads quantities…
Plan the programme, freeze a baseline to measure against, feed real progress back from site…
Load a converted model, lift the element quantities straight off the geometry, carry them i…
Load a DWG, lock the scale against a known dimension, measure the areas, lengths and counts…
Close the day out properly: record the diary, book the labour and plant hours, upload the p…
Inspect the work against its acceptance criteria, raise a non-conformance the moment it fai…
Capture a scope change while it is fresh, price it as a contract variation on your agreed r…
Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…
Finish the job cleanly: work the punch list to zero, confirm every inspection passed and no…
Pull priced items from a real cost database, build the bill from them, bundle recurring bui…
Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…
Take a folder of returned tenders that never quite match, strip them back to the same scope…
See where the job truly stands against the plan and the budget: bring the programme current…
Bring the discipline models together on one coordinate base, run the clash test, clear the…
Turn a question from the working face into a tracked request, drive it to the party who own…
Brief the crew on the hazards this shift actually carries, capture who was there, then prov…
Value the work put in place this period against the contract, raise the application with th…
Pull the as-built record together, prove the quality file has no gaps, then issue an operat…
Capture every change in one register, read the time and cost impact scored against the real…
Turn a certified valuation into a compliant electronic invoice, issue it in the structured…
Stand up a new job so everything downstream has one clean spine to attach to: create the re…
Turn a build-up you price again and again into one reusable assembly: pick the component it…
Move a priced estimate to another region without guessing: pick the regional cost base, app…
Spread the priced work across the programme to see cash in and cash out month by month, fin…
Turn instructed extra work into a claim that gets paid: record the labour, plant and materi…
Walk the finished works with the client, record what passes and what does not against the a…
Hold the job to its number: fix the priced bill as the budget baseline, track committed and…
Put the product you plan to buy in front of the designer with its data behind it, get it ch…
Mark up where the programme actually is, gather the week of diary entries and photos that p…
Register a new drawing revision, mark the old one superseded, transmit it to every trade th…
Set the cost you have committed against the value you have earned to the same cut-off date,…
Agree the hold and witness points for a trade before it starts, inspect at each point as th…
Log the near-miss while the detail is fresh, work out the cause and set the corrective acti…
Hold a priced estimate up against the reference cost base and your own history, flag the ra…
Pull the next two to three weeks off the master programme, clear the constraints sitting in…
Put an order-of-magnitude number in front of the board before a single drawing exists: pull…
Once the building is occupied, log every reported defect against the contractor and a due d…
Value your own work against the agreed schedule of values, submit it the moment the cycle o…
Structure a cost plan by classified element rather than by trade, check it against the clas…
Read the labour and plant the near-term programme actually needs, check it against what is…
Turn a conflict spotted in the federated model into a formal design query, get it answered…
Confirm the programme has genuinely hit its milestone, cross-check it against the earned va…
Run the checks that catch a bad model before a client or a site team opens it: coordinate b…
Put your insurance, qualifications and safety record in front of a contractor once, get app…
Take a design or an accepted tender you did not price yourself, benchmark it honestly again…
Follow a design change from the drawing that carries it, through the site instruction, to t…
Walk the risk register on a regular cadence, score likelihood and impact honestly, and assi…
Plan a short safety briefing for the day, high-risk activity, deliver it to the crew, captu…
Build a method statement and risk assessment for a work package before it starts, describe…
Turn the agreed scope and the priced BOQ into a baseline programme: list the activities, se…
Take the actual progress the site reports, mark activities complete or part complete, let t…
Turn the BOQ and the programme into a buying schedule: list the packages to buy, set lead t…
When a change is instructed, capture it, price the added or omitted work from your rates, c…
Build the monthly interim application: measure the work done to date, value it against the…
Run a clash coordination round: federate the discipline models, detect the clashes, triage…
Pull together the operation and maintenance manual: collect the as-built drawings, product…
Build the asset register the operator will run the building from: capture the installed ass…
Keep the drawing register under control: log every drawing and its current revision, issue…
Turn the asset register into a preventive maintenance plan: pick the assets that need sched…
Get a failed asset fixed on the maker's coin: confirm it is in warranty, raise the claim ag…
Make sure the model hands over usable asset data: read what the BIM carries, check it again…
Drive the defects to zero before you hand over: work the open snags, re-inspect the fixes,…
Prove the services actually work before handover: set the commissioning checks, witness eac…
Only pay for what you ordered and received: line the invoice up against the purchase order…
Close the contract cleanly: settle the final account from the agreed variations and valuati…
Bring an over-budget design back to target without gutting it: find the costliest elements…
Turn an invitation to tender into a clean bid: read the scope and the conditions, price you…
Catch the hazards before they hurt someone: walk the site against a checklist, raise the un…
Put a real number on running the building: list the assets to maintain, price their planned…
Stop a long-lead item stalling the job: find the items whose delivery beats the programme,…
Chair a site progress meeting, capture the decisions, turn each into an owned action or RFI…
Match imported elements to cost items, let AI price the scope, accept it into the bill and…
Zone the works, set a takt beat, level the crews to hold it, and publish the line of balanc…
Capture the client contacts, run the opportunity through the pipeline, convert the win into…
Register owned and hired plant, book its hours to the job, keep it inspected, and report ut…
Raise a permit to work, tie it to its safe system of work, and close it out in the record.
Log shop drawings and submittals, check them against spec, issue for review, and flag anyth…
Stand up the common data environment, load the information containers with the right status…
Define your labour, plant and materials once, build assemblies from them, and reuse the sam…
Take the approved hours off site, run them through payroll at the right grade and rate, and…
See every live project and what it demands on one board, compare that demand to the crews a…
Write down what information the employer actually needs from the models, set the federation…
Open the claim under the right contract clause, pull the site diary records that prove the…
Import and keep your supplier price lists current, raise the project buying schedule agains…
Open the current drawing revision, redline it with comments for the design team, and overla…
Load the site scan, overlay the design model to spot where the build has drifted from the m…
Start from the priced bill, link cost to the model and the programme, and tie the cost bloc…
Open a controlled window onto the job for the client: choose what they see, show them the a…
Run a design or engineering change through proper control: raise it with its reason and ris…
A verbal instruction costs you nothing you can prove. Log the call while it is fresh, confi…
Work out what a site is worth to a developer: set the scheme mix and areas, price the build…
Handle a fault the way a building operator should: log the reactive request against the ass…
Receive a GAEB tender file, bring it in as a bill without rekeying, price the positions, va…
Price the cost of running the job itself - site staff, welfare, plant, scaffolding and insu…
Handle the parts of a bill the design cannot yet fix - provisional sums, prime cost sums an…
Bring base-date rates forward to the midpoint of construction using published cost indices,…
Turn a base wage into a true cost per productive hour by adding on-costs and dividing by th…
Capture the assumptions, inclusions, exclusions and qualifications behind a price and issue…
Take a production norm per unit, expand it across the takeoff quantity into labour, plant a…
Normalise structurally different bids - filling the scope gaps and pricing the qualificatio…
A bidder query or a design change lands mid-tender. Capture it, draft the addendum, reissue…
Turn a winning bid into a live subcontract order: confirm the agreed scope and rates, raise…
Bring an external programme in from an exchange file, check the calendars and links survive…
Link model elements to schedule activities, play the build order back as a 4D animation, ch…
Tie payment milestones to real programme events, value each one so the schedule sums back t…
Gather the latest model from each discipline, combine them into one aligned federation, wal…
Open the information requirements, check a delivered model against them for naming, classif…
Load a laser-scan point cloud of the existing conditions, measure the distances, areas and…
Define a clash profile - which element sets test against which, and at what tolerance - run…
Book a delivery in at the gate, check quantity and condition against the order, reconcile w…
Register every temporary works item, record the design check and coordinator sign-off, insp…
Run the pour card loop end to end: raise the request, clear the pre-pour hold point, releas…
Get the site ready before work starts: run the mobilisation checklist for hoarding, welfare…
Keep the statutory health and safety registers current, log and investigate incidents, trac…
Build the interface register, give each interface an owner on both sides and the informatio…
Build the quality checklist from the specification, complete it on site with photos and sig…
Log the delay event with its evidence, insert it into the programme to measure the real imp…
Capture the retention terms both ways, track what you hold on each subcontractor, release i…
Match a supplier's monthly statement against your own purchase ledger, resolve the differen…
Do not walk away at practical completion: confirm the in-use performance targets, set up an…
List every permit and planning condition, book the final statutory inspections, collect the…
Collect every product and workmanship warranty from the supply chain, register each against…
Pull together the drawings and supporting documents an authority submission needs, build and…
Open a review cycle against a document version, log and respond to the remarks that come bac…
Pick the document that needs formal sign-off, open a signing session with the right signator…
Register the source documents the project depends on, verify them, see what is expiring or m…
Pick the work type, classify the delivery and approval route it needs to follow, confirm the…
Plan and conduct a supervision visit, log observations and flag hidden works to inspect befo…
Run the CDE setup wizard, adopt a ready-made ISO 19650 review flow in one click, tailor it t…
Take what the plan reader proposed on a PDF sheet and decide, proposal by proposal, what des…
Take the check you run manually every week, build it once as a pipeline from a ready-made te…
Export a priced bill to FIEBDC-3, the budget format the Spanish and Latin American market ex…
Pull every due date the platform tracks into a single register, see what is genuinely late r…
Spot the letter, RFI or captured message that is asking for something to be done rather than…
Turn the asset register into the COBie UK 2.4 workbook an FM system can actually import: fil…
Open one drawing and see every mark the project has recorded against it, punch pins, plan pi…
Give an assembly named parameters and drive its component quantities from formulas over them…
Diff an issued sheet set against the drawing index and see what is missing, what turned up u…
Build a review route from a preset, dry-run it to see which role each step lands on and whet…
Read the client's GAEB X83 tender straight into a bill instead of retyping it, price every p…
The tender arrives as PDF sheets with no model behind them. Calibrate the plan, measure leng…
Turn a period of finished work into an electronic invoice a German public client will actual…
Send one work package to several Nachunternehmer, level what comes back onto the same scope,…
Read the Deckungsbeitrag while the site is still running: set the Soll from the calculation,…
Write the site day while it happens - weather from an independent source, crews, progress, o…
Register the contract, raise each Abschlagsrechnung against it, open a payment clock over th…
The ground is different, the drawing changed, the client ordered extra. Capture the changed…
Build the Mittellohn, keep your own material and plant rates, compose the recipes that carry…
Log every Mangel with photo and location, clear the list before the Abnahme, sign a protocol…
Build the cost plan on the DIN 276 cost groups, code every position to its Kostengruppe, rea…
Take the contractor's GAEB inquiry into your own LV, price your trade with your own rates, d…
Set the job to imperial, calibrate a PDF sheet against a dimension printed on it, measure in…
Agree a schedule of values against the contract sum, bill the period on a continuation sheet…
Write the day from yesterday's report, book the crew against cost codes, record equipment wo…
Serve notice inside the contract clock, describe the change against the scope it departs fro…
Build a burdened crew rate from what you actually pay, add your own material and equipment p…
Invite bidders against a written scope, take their spreadsheets in the form they send them,…
Make a signed waiver the condition of getting paid rather than paperwork chased afterwards:…
Agree the milestones, bill them as they complete, and let the prompt payment law that govern…
Record each subcontractor's tax standing and the certificates they carry, let the expiry dat…
Issue an invoice that meets the proper-invoice requirements, open a statutory clock on the d…
Value the work for the month, show the certified amount and the 10 percent holdback as separ…
Record a Quebec subcontractor's RBQ licence with the subclass it actually carries, check tha…
Give notice of the event inside the period the contract allows, raise the change against the…
Take the hourly rate you have used for years apart into the base wage and the named contribu…
Measure the drawings in metric, keep the quantity metric everywhere it is stored and exporte…
Settle province by province whether the sales tax on a cost is money you get back or money y…
Certify and date substantial performance once, put every consequence that runs from it onto…
Say what each estimate was prepared from and which class of the ladder that puts it in, carr…
Level the bids for a package onto one scope, check the intended winner's documents as at the…
Take a coded item on a bill of quantities, put your own labour, material and plant behind it…
Set the awarded bill beside the settlement bill, get every line that moved classified as add…
Value one period against the contract's schedule of values from what the site actually compl…
Record the event on the day it happens, then route it to the right instrument: an instructed…
Price the completed and undisputed quantities for one period including the changes accepted…
Load a national cost base, build quota-based rates from it to compile the owner's control pr…
Measure on the drawing, land the quantity on a bill item, give the item its GB 50500 code an…
Read the adjustment clause, load the index series it names, put an escalation line on the bi…
Hold the owner's provisional sums in a register, carry the specialist packages in the bill s…
Set an investment estimate with a rate per square metre behind it, write down what it assume…
Take the BC3 a promotor or an architect sends you, bring the capitulos and partidas in witho…
Price the resources once, build the precios auxiliares your work is actually made of, compos…
Prove the site is really available before you sign anything, get the acta signed by both sid…
Read what the estudio actually requires, turn it into a risk analysis per activity you can h…
Record the visit, write each order as what it actually is, pair it with the contractor's own…
Measure what was executed against each partida, value it at the contract rates, get the cert…
Establish first whether the contract allows revision at all, record the published coefficien…
Work out where you sit in the chain, record the determination against the invoice with the a…
Get the certificado final de obra signed, take the acta de recepcion with its reservas writt…
Turn a floor area and a building type into an order of cost estimate with an elemental split…
Measure off the drawings, roll the quantities up before writing a rate, write each item the…
Draw the contract from the standard form the job is really being run under, say what the ret…
Value the work for the period, open the clock the statute imposes, record every notice as it…
Check who you are paying, record their scheme standing and the verification behind it, work…
Notice the change while it is still a fact, price it the way the contract says to price it,…
State what information the building safety regime will ask for, keep it in a common data env…
Clear the snagging list, issue the certificate against a package that exists, run the rectif…
Establish what was notified and what was not, assemble the contemporaneous records into one…
Establish which schedule of rates the contract is written against, load that one as a cost b…
Take the quantities off the drawing the way the Indian method of measurement says to take th…
Open a schedule item into the material, labour and plant it actually consumes, price those w…
Price the bill tax exclusive, carry profit, contingency, the labour cess and the tax as sepa…
Fix the estimated cost the tender is called on, issue the same bill to every bidder, receive…
Measure the work before it is covered up, get the record checked and signed on site, turn th…
Record the escalation clause with its components, weightages and base date, load the index s…
Decide whether the scheme needs registration, register it with the completion date you can d…
Write the concrete inspection and test plan, clear each pour before it starts, cast and trac…
Take the work from a preliminary estimate and its approval to a detailed estimate and its te…