159个建筑实战指南,即刻可用。
涵盖估算与成本、招标与采购、BIM 与工程量计算、现场与作业、商务与合同、移交与全生命周期,都是建筑团队实际使用的端到端工作流程。每一个都是可以在实时演示中打开、按步骤跟做的真实案例,并说明每个阶段该做什么、为什么这样做。
涵盖估算与成本、招标与采购、BIM 与工程量计算、现场与作业、商务与合同、移交与全生命周期,都是建筑团队实际使用的端到端工作流程。每一个都是可以在实时演示中打开、按步骤跟做的真实案例,并说明每个阶段该做什么、为什么这样做。
Take what the plan reader proposed on a PDF sh…
Take the check you run manually every week, bu…
Export a priced bill to FIEBDC-3, the budget f…
Pull every due date the platform tracks into a…
Spot the letter, RFI or captured message that…
Turn the asset register into the COBie UK 2.4…
Open one drawing and see every mark the projec…
Diff an issued sheet set against the drawing i…
Build a review route from a preset, dry-run it…
Read the client's GAEB X83 tender straight int…
The tender arrives as PDF sheets with no model…
Read the Deckungsbeitrag while the site is sti…
The ground is different, the drawing changed,…
Build the Mittellohn, keep your own material a…
Log every Mangel with photo and location, clea…
Build the cost plan on the DIN 276 cost groups…
Take the contractor's GAEB inquiry into your o…